Hello, welcome to visit Jiangsu Haixin shipping Heavy Industry Co., Ltd. website!
Language:中文 English
Wonderful content loading
1 2 34
  • 海新重工HX008完工四方确认及交船签字

    DATE: 2016-12-25

    On December 1st, 2014, a ceremony was held for the confirmation of the date of completion and delivery of the 4500m3/h cutter suction dredger (New Haichang), which was built by Jiangsu Haixin shipyard for CCCC Shanghai Dredging Co.,Ltd. New...

    DETAIL

  • 海宏、海新联手救人纪实

    DATE: 2016-12-25

    Around 8:20 a.m. on May 11th, 2014, China merchants heavy industry wharf on duty employees ShenYujun found thatsomeone floating on the t waters nearby. He immediately notify the managerMengyuansan, Meng managergave the order to dispatch the...

    DETAIL

  • Keel Laying Ceremony of 1000T Emergency Rescue Salvage Float

    DATE: 2016-12-25

    1000T emergency rescue and salvage floating crane built by Haixin shipyard held Keel laying ceremony on November 20th, 2014. This ship is designed for the emergency rescue and salvage crane work of Three Gorges Reservoir Area.it is the first...

    DETAIL

  • Delivery of the Yangtze River Estuary Tug

    DATE: 2016-12-25

    On the morning of september 30th, 2014, Jiangsu Haixin shipping heavy industry Co., Ltd held signature delivery ceremony for the Yangtze River Estuary 4000 horsepower tug in Hengsha base of Yangtze River Estuary Waterway Bureau,which was i...

    DETAIL

  • A 75-meter pile driving ship named Changxiang 6 was successf

    DATE: 2016-12-25

    A simple handover ceremony was held on the morning of August 18th in Haixin office. A 75-meter pile driving ship named Changxiang 6 was successfully handed over to the Bureau of YichangChangjiang Waterway Engineering. The Changxiang 6 shipwa...

    DETAIL

  • The commencement ceremony of 1000T Emergency Rescue and Salv

    DATE: 2016-12-25

    On August 9th, 2014, 1000 T emergency rescue and salvage floating crane owned by Changjiang Waterway Bureau was officially commenced in haixin shipyard, which indicated that the first phase of infrastructure construction was completed and a...

    DETAIL

  • The Commencement Ceremony of Marine Engineering Equipment Pr

    DATE: 2016-12-25

    On the morning of May 30th, 2014, the marine engineering equipment project was held at the new site of Jiangsu Haixin Shipping Heavy Industry. Some leaders from related departments attended the event, including the leaders from Haimen Govern...

    DETAIL

  • 江苏海新船务重工有限公司900吨龙门吊顶升仪式隆重举行

    DATE: 2016-12-23

    On December 20, 2011 at 9:30 am,. 900 tons gantry crane lifting ceremony was ceremoniously held in Jiangsu Haixin Shipping Heavy Industry Co., Ltd. The high standing of the lifting frame, with sixteen sets of cables in a brisk wind brush so...

    DETAIL

  • Jiangsu maritime bureau deputy director

    DATE: 2016-12-23

    At midday on December 18, 2011, Jiangsu maritime bureau deputy director Mr. Wang Xiufeng and the Yangtze River waterway administration deputy director Mr. Zhu Ruming together to visit Jiangsu Haixin Shipping Heavy Industry Co., Ltd. Preside...

    DETAIL

  • Warm-hearted support,a new chapter of school-enterprise coop

    DATE: 2016-12-23

    The signing ceremony for the establishment of the Student activity sponsorship and the student practice base between Jiangsu Haixin Shipping Heavy Industries Co., Ltd. and the School of Naval Architecture, Ocean Civil Engineering of SJTU wa...

    DETAIL

  • Copyright 2016-2019 Jiangsu Haixin shipping Heavy Industry Co., Ltd. all rights reserved 苏ICP备10223514号-1
    Hotline:0513-82181366 E_mail:jiangsuhaixin@jshxship.com
    Adress:Number 3006 Xianggang Road,Binjiang Street,Haimen City,Jiangsu Province

    ONLINE
    TOP